top of page
Infill
Site: Floodgate Street, Digbeth, Birmingham, UK
Purpose: Residential
Project type: Individual
Module: ARC4032 Design Resolution 1
My first design project followed a series of group site analysis tasks for our site in Digbeth, Birmingham. A derelict area of land was assigned to us, and we were tasked with designing a house for two chosen clients on a narrow plot of land. Additionally, the building was designed as a “home for the future, set in 2030”, and so allowed for more ambitious designs and therefore more creative freedom when designing this project.
Read more about this project here.




bottom of page